[1]
Pratiwi, D.S. and Asmoro, D. 2024. Overview of Mini Pile Pile Erection Work with STA 10+161 Drop Hammer Method IKN Segment 3B Toll Road Project Kariangau-Simpang Tempadung Summit. JSE Journal of Science and Engineering. 3, 1 (Jul. 2024), 1–8. DOI:https://doi.org/10.30650/jse.v3i1.3931.