[1]
Devedo, M.G. and Lestari, D.A. 2015. Analysis of Contract Change Order (CCO) in the Samarinda Road Preservation Project. JSE Journal of Science and Engineering. 3, 2 (Jan. 2015), 66–73. DOI:https://doi.org/10.30650/jse.v3i2.4227.