Pratiwi, D. S., & Asmoro, D. . (2024). Overview of Mini Pile Pile Erection Work with STA 10+161 Drop Hammer Method IKN Segment 3B Toll Road Project Kariangau-Simpang Tempadung Summit. JSE Journal of Science and Engineering, 3(1), 1–8. https://doi.org/10.30650/jse.v3i1.3931