PRATIWI, D. S.; ASMORO, D. . Overview of Mini Pile Pile Erection Work with STA 10+161 Drop Hammer Method IKN Segment 3B Toll Road Project Kariangau-Simpang Tempadung Summit. JSE Journal of Science and Engineering, [S. l.], v. 3, n. 1, p. 1–8, 2024. DOI: 10.30650/jse.v3i1.3931. Disponível em: https://journals.umkt.ac.id/index.php/jse/article/view/3931. Acesso em: 21 nov. 2024.