Pratiwi, D. S. and Asmoro, D. . (2024) “Overview of Mini Pile Pile Erection Work with STA 10+161 Drop Hammer Method IKN Segment 3B Toll Road Project Kariangau-Simpang Tempadung Summit”, JSE Journal of Science and Engineering, 3(1), pp. 1–8. doi: 10.30650/jse.v3i1.3931.